SCHOEN v. LOUISIANA PACIFIC CORPORATION (1997)

Court of Appeal, First District, Division 2, California.

Karl SCHOEN et al., Plaintiffs and Appellants, v. CALIFORNIA DEPARTMENT OF FORESTRY & FIRE PROTECTION et al., Defendants and Respondents; LOUISIANA-PACIFIC CORPORATION, Real Party in Interest and Respondent.

No. A074723.

Decided: August 07, 1997

Rodney Richard Jones and Sharon Duggan, Mendocino, for Plaintiffs and Appellants. Daniel E. Lungren, Attorney General, Roderick E. Walston, Chief Assistant Attorney General, Charles W. Getz, IV, Senior Assistant Attorney General, John Davidson, Supervising Deputy Attorney General, for Defendants and Respondents. Rawles, Hinkle, Carter, Behnke & Oglesby by Jared G. Carter, Cindee F. Mayfield, Ukiah, for Real Party in Interest and Respondent.

Karl Schoen, Judith Vidaver, Roanne Withers, and Ron Guenther (collectively, Schoen), residents of Mendocino County, appeal from the denial of their writ of mandate.   Schoen claims the California Department of Forestry and Fire Protection (CDF) abused its discretion when it approved analyses of cumulative impacts as “minor deviations” to two timber harvest plans (THPs).  By classifying them as minor deviations, the documents were not subject to public review.   Real party in interest, Louisiana-Pacific Corporation (Louisiana-Pacific) had submitted this information to comply with the subsequently enacted California Code of Regulations, title 14, section 912.9 (hereafter references to “rules” are to the various sections of title 14 of the California Code of Regulations).

The question before us is whether CDF abused its discretion in approving Louisiana-Pacific's analysis of cumulative impacts as minor deviations when the original THPs were essentially silent on this issue.   We find the California Environmental Quality Act (CEQA) and the Z'Berg Nejedly Forest Practice Act of 1973(FPA) mandate public review of this critical issue;  CDF therefore abused its discretion by insulating this information from public review.

BACKGROUND

In April 1989, CDF approved THP 1-89-100 MEN (THP 100) and THP 1-89-145 MEN (THP 145) submitted by Louisiana-Pacific.   The two plan sites are adjacent to each other on Louisiana-Pacific's timber production zone property in the Albion River drainage.   As originally approved, the plans allowed the harvest of approximately 280 acres of second-growth mixed conifer forest by a combination of clear cutting and shelterwood silvicultural methods.

With regard to a cumulative impacts analysis, the THPs approved in 1989 contained the identical discussion under the heading “Future,” which was as follows:  “One additional THP is presently being considered in the immediate area.   A tentative map of this future THP is included for your review.   Modern environmentally sensitive harvesting methods using cable logging techniques, where appropriate, will allow for timber to be harvested in this area without causing a significant environmental impact when considered either separately or in conjunction with other events in the area.   Cable yarding on the steeper slopes will minimize the potential for sediment to enter the stream system.   Other potential adverse cumulative effects associated with the proposed THP have been considered and no problems have been identified.

“I am aware of no other projects which are being planned at this time in this area.   Land adjacent to the plan area is predominately zoned TPZ [timber production zone].   It is probable that future activities will be consistent with this land use classification and that future harvesting in this area will conform to the forest practice act and other regulations which may exist at the time of future harvest.   Review and observation of the Albion river shows that no significant cumulative adverse impact can be expected as a result of these harvesting operations or from the combined effect of these operations and other land use activities.”

In addition, the approved plans contained a 15-item checklist requesting a response to whether significant adverse cumulative impacts would be reasonably expected to occur in (1) surface soil erosion from harvest or roads, (2) mass soil movement from harvest or roads, (3) soil compaction from harvest, (4) chemical or biological properties of soil, (5) water quality from harvest or roads, (6) water temperature, or (7) suspended sediment, or to (8) fish or wildlife or their habitat, (9) recreation, (10) aesthetics, (11) rare or threatened or endangered species of plants or animals or to their habitats, (12) archaeological resources, (13) fire hazards (14) vehicular traffic, or (15) any of the above items when considered together.   For all the items except fire hazards, Louisiana-Pacific responded it did not expect any significant adverse cumulative impacts.   With regard to fire hazards, it stated the following:  “There will be a short term increase at least partially off set by the improved access and the availability of manpower and equipment during the operation.   This plan is not in a High fire danger start area.   Slash hould [sic ] decay rapidly in this moist coastal climate.”

A lawsuit challenging the approval of THP 100 and THP 145 ensued, which was ultimately dismissed for failure to exhaust administrative remedies.   As a result of the litigation, timber operations were stayed until February 1992.

In 1991, the Board of CDF (board) enacted new regulations requiring THPs to contain (1) a written analysis of cumulative environmental impacts (rule 912.9), (2) information concerning the spotted owl (rules 919.9, 919.10), and (3) data on expanded watercourse and lake protections (rules 916.1-916.10).

The new regulations required a cumulative impact assessment of the following resource subjects:  watershed, soil productivity, biological, recreation, visual, and traffic.  (Rule 912.9.)   Under the new regulations, THPs had to include data on the pending project and also past, present, and reasonably foreseeable future projects.  (Rule 912.9.)   Rule 912.9 also required a listing and description of the individuals, organization, and records consulted when assessing the cumulative impacts for each resource subject.

On April 22, 1992, about two months after lifting the stay on the timber operations, CDF formally required Louisiana-Pacific to amend THP 100 and THP 145 to reflect the changes Louisiana-Pacific had made for the protection of water courses and the spotted owl.   CDF based its request on authority from Public Resources Code section 4583 and a First District opinion in Division Five, Public Resources Protection Association of California v. California Department of Forestry and Fire Protection, A044789 (which was reversed in part by the Supreme Court on January 31, 1994, in Public Resources Protection Assn. v. Department of Forestry & Fire Protection (1994) 7 Cal.4th 111, 27 Cal.Rptr.2d 11, 865 P.2d 728 (PuRePac )).

In this same letter, CDF also made the following requests:  “I am also requesting, at this time, that you evaluate cumulative impacts on each THP according to Board of Forestry Technical Rule Addendum No. 2, Cumulative Impacts Assessment, and amend the plans to reflect the results of your evaluation.  [¶] The Department will consider your amendments to the plan under 14 CCR 1036.[¶]  You may not operate on these plans until the requested amendments have been acted on by this Department.”

Louisiana-Pacific refused to comply and after CDF issued a stop order, Louisiana-Pacific challenged CDF's action in court.   In Louisiana-Pacific Corp. v. Department of Forestry & Fire Protection ( *(1993), 21 Cal.Rptr.2d 468, opinion superseded by grant of review), we found Public Resources Code section 4583 provided CDF with the discretion to require amendments to make the THPs conform to subsequently implemented regulations.   The Supreme Court granted review of this case, but then dismissed review on August 18, 1994, after deciding PuRePac, supra, 7 Cal.4th 111, 120, 27 Cal.Rptr.2d 11, 865 P.2d 728.   The court in PuRePac held Public Resources Code section 4853 provided CDF with authority to require compliance with subsequent regulations.   The THP in PuRePac had been approved prior to the enactment of regulations concerning the spotted owl (rule 919.9, 919.10);  the timber operator therefore had to comply with the later regulations by resubmitting its plan for approval, filing an amendment to the THP, or notifying CDF of “ ‘minor deviations' ” immediately in writing.  (PuRePac, supra, 7 Cal.4th at p. 123, 27 Cal.Rptr.2d 11, 865 P.2d 728.)

In a letter, dated September 30, 1994, CDF again requested amendments to THP 100 and THP 145.   The letter stated in part:  “The amendments should reflect any changes made or that will be made in actual operations not now reflected in the plans due to the rule changes for the following subjects:

“Watercourse and Lake protection (effective 10-23-91)

“Spotted Owl Consultation procedures (effective 5-28-91)

“Silvicultural Methods (effective 5-16-94)

“Site Preparation (effective 2-1-90)

“Domestic Water Supply Protection (effective 3-1-94)

“Hazard Reduction (effective 8-5-91)

“Wildlife Protection (effective 9-11-91)

“Marbled Murrelet Protection CCR 919.11 (effective 6-18-92)

“Late Successional Forest Stands (effective 3-1-94)

“Logging Roads and Landings (effective 2-1-90 & 2-13-91)

“Archeology Resource protection (effective 12-27-91)

“Cumulative effects evaluation (effective 8-26-91)

“I suggest that you review each section under each subject.   Check the history of the sections.   If the rule was adopted after your plan was approved, evaluate whether or not your plan needs to be amended to bring it into conformance.   Normally, if the rule pertains to planning only, no action on your part is necessary.   If the rule pertains to the actual timber operations, then you should amend the plan to bring it into conformance or use the ‘substantial liabilities incurred’ clause to request a waiver.

“․

“I realize that the operations conducted last year have been in full compliance with the new regulations, but the plan needs to reflect actual ground operations.   If they are different, the plans must be amended.   Any amendments to the plans will be treated as outlined in 14 CCR 1036 and 1040.

“The Board of Forestry's rules on evaluating cumulative effects also became operative during the time these two plans were in court.   While CDF did not require any landowner to amend existing plans when these new rules became effective, this is a major issue with the Friends of the Enchanted Forest.  [¶] I suggest that you include an update of your information that was submitted with THP 1-91-080.   As you have stated, an exhaustive cumulative effects analysis was done for the Albion River drainage during the review of 1-91-080-MEN.   This analysis was done with the assumption that plans 100 and 145 were logged.   A review of plan 080's file confirms your statement.   Our conclusion on plan 080 was that there were no adverse cumulative effects occurring or were likely to occur if plan 080 were operated.

“Logically, we would come to the same conclusion on plans 100 and 145 since they were included in this later analysis.   This conclusion would only hold if plans 100 and 145 were not changed and that nothing further had happened in the Albion River drainage after plan 080 was approved to change the analysis.   You could bring the 080 cumulative effects analysis up-to-date.   Included in this updated analysis would be any changes in the operations on plans 100 and 145 and any plans or projects that have been revealed within the assessment area since the approval of plan 080.

“If you have a better idea of what future plans or projects will be, you should include this within your analysis.   We will include by reference the cumulative effects analysis done on plan 080.”

On November 21, 1994, Louisiana-Pacific submitted as “minor amendments” supplemental information on watercourse protection, spotted owl consultation procedures, silvicultural methods, site preparation, domestic water supply protection, hazard reduction, wildlife protection, marbled murrelet protection, late successional forest stands, logging roads and landings, archeology resource protection, and a cumulative effects evaluation.

CDF approved the submissions as minor deviations to both THPs on December 1, 1994.   CDF wrote, in pertinent part:  “Your Amendment ․ to the above-referenced Timber Harvesting Plan has been accepted as being in conformance with the Rules and Regulations of the Board of Forestry and is now considered part of the plan.   The determination to accept your request to treat this as a minor deviation has been made based on the information presented in your amendment and a review of the Timber Harvesting Plan file.   The amendment establishes a reduction in overall environmental disturbance and CDF's inspection reports confirm compliance with currently applicable watercourse rules.  [¶] ․ Your proposal to remove winter period operations makes a significant contribution in reducing the potential for adverse environmental impacts.   In addition, inspection reports for this THP contain observations which confirm that watercourse protection zones have been established in conformance with currently applicable Forest Practice Rules.”

In a first amended petition for writ of mandate filed on February 2, 1995, Schoen claimed the acceptance of the submissions without public review violated CEQA (Pub. Resources Code, § 21000) and the FPA (Pub. Resources Code, § 4511 et seq.), and “deprived the public of its statutory and constitutional right to provide meaningful comments about environmental issues relating to cumulative impacts” of THP 100 and THP 145.

The trial court denied the petition, ruling CDF did not abuse its discretion.   The court found:  “Essentially, CDF departed from the position which it took in 1992, and did not require [Louisiana-Pacific] to prepare an analysis pursuant to Rule 912.9.   It did not abuse its discretion in doing so.   Only 13 acres in THP 100 and 89 acres in THP 145 remained to be harvested.   The minor deviations proposed by [Louisiana-Pacific] eliminated winter operations and rendered the harvesting less intrusive than allowed under the original plans approved in 1989.

“I conclude that CDF had no mandatory duty to set aside its approval of THPs 100 and 145, to require submission of the proposed minor deviations for further public review or comment, or to demand full compliance with Rule 912.9.   See, PuRePac v. CDF (1994) 7 Cal.4th 111, at 122, 27 Cal.Rptr.2d 11, 865 P.2d 728.   Under the unique and procedurally convoluted circumstances of this case, I cannot say that CDF abused its discretion in dispensing with further public comment and review, and in giving due weight to the need for finality of these THPs.”

Judgment was entered on May 9, 1996, and Schoen filed a timely notice of appeal on June 13, 1996.

DISCUSSION

I. Standard of Review

 Schoen contends CDF had a duty to permit the public to review the cumulative impacts analysis for THP 100 and THP 145, and its failure to do so constituted an abuse of discretion.  “ ‘Abuse of discretion is established if the respondent [agency] has not proceeded in the manner required by law, the order or decision is not supported by the findings, or the findings are not supported by the evidence.’  [Citations.]  Only if the manner in which an agency failed to follow the law is shown to be prejudicial, or is presumptively prejudicial, as when the department or the board fails to comply with mandatory procedures, must the decision be set aside, however.  [Citation.]”  (Sierra Club v. State Bd. of Forestry (1994) 7 Cal.4th 1215, 1236, 32 Cal.Rptr.2d 19, 876 P.2d 505 (Sierra Club ).)

Both CDF and Louisiana-Pacific maintain the standard of review is whether substantial evidence supported its decision.  (See Laurel Heights Improvement Assn. v. Regents of the University of California (1988) 47 Cal.3d 376, 407, 253 Cal.Rptr. 426, 764 P.2d 278 [“The question, however, is not whether there is substantial evidence to support the [petitioner's] position;  the question is only whether there is substantial evidence to support the [agency's] conclusion.”].) Substantial evidence, they claim, clearly supported CDF's determination.

Since we find the agency did not act in accordance with the FPA and CEQA, and CDF's actions were prejudicial, we do not address the issue of substantial evidence.

II. Statutory Background

When arguing CDF abused its discretion, Schoen primarily relies on provisions in CEQA (Pub. Resources Code, § 21000 et seq.) and ignores provisions in the FPA stressed by CDF and Louisiana-Pacific.  (All further unspecified code sections refer to the Public Resources Code.) CDF and Louisiana-Pacific dispute the relevance of the CEQA provisions stressed by Schoen, and focus on the FPA (§ 4511 et seq.) and administrative regulations (Forest Practice Rules;  rule 895 et seq.).   Thus, we find it necessary at the outset to summarize the relevant FPA and Forest Practice Rules and their relationship with CEQA.

California regulates the harvesting of timber on private lands through the FPA (§ 4511 et seq.) and Forest Practice Rules (rule 895 et seq.).   The legislative intent in enacting the FPA is set forth in section 4513:  “It is the intent of the Legislature to create and maintain an effective and comprehensive system of regulation and use of all timberlands so as to assure that:  [¶] (a) Where feasible, the productivity of timberlands is restored, enhanced, and maintained. [¶] (b) The goal of maximum sustained production of high-quality timber products is achieved while giving consideration to values relating to recreation, watershed, wildlife, range and forage, fisheries, regional economic vitality employment, and aesthetic enjoyment.”

The Legislature has provided for the Secretary of the Resources Agency to certify a regulatory program of a state agency as exempt from the requirement of an environmental impact report (EIR) under CEQA if the program requires the project be preceded by the preparation of a written report containing certain information on the environmental impacts of the project. (§ 21080.5, subd. (a).)  “The document that functions as the equivalent of an EIR must also include a description of the proposed activity, its alternatives, and mitigation measures to minimize any significant adverse environmental impact, and must be available for a reasonable time for review and comment by other public agencies and the general public. (§ 21080.5, subd. (d)(3).)  [¶] In January of 1976, pursuant to the provisions of section 21080.5, subdivision (a), the Secretary of the Resources Agency certified the regulatory scheme created by the [FPA]. Under the terms of section 21080.5, subdivision (c), that certification expressly exempts the [THP] process from the provisions of chapters 3 and 4 and section 21167 of CEQA. (§ 21080.5, subd. (c).)”  (Sierra Club, supra, 7 Cal.4th 1215, 1230, 32 Cal.Rptr.2d 19, 876 P.2d 505.)

Under the FPA, CDF must approve a THP prior to any timber harvesting operation in this state. (§ 4582.)   It constitutes an “abbreviated project plan [ ]” authorized by law rather than a “full-blown” EIR. (Environmental Protection Information Center, Inc. v. Johnson (1985) 170 Cal.App.3d 604, 620, 216 Cal.Rptr. 502 (Epic ).)   THPs must include statutory information outlined in section 4582 and be available for review and comment by the public and other public agencies. (§ 4582.6.) “The [CDF] shall invite, consider, and respond in writing to comments received from public agencies to which the plan has been transmitted and shall consult with those agencies at their request.” (§ 4582.6, subd. (a).)

 If CDF approves of the THP, it issues a notice of approval which includes a written response to “ ‘significant environmental points raised during the evaluation process,’ including those points raised by members of the general public.  [Citations.]”  (Epic, supra, 170 Cal.App.3d 604, 611-612, 216 Cal.Rptr. 502;  see § 21080.5, subd. (d)(2)(iv).)  “CEQA and its substantive criteria for the evaluation of a proposed project's environmental impact apply to the timber harvesting industry, and are deemed part of the FPA and the [Forest Practice] Rules.”  (Epic, supra, 170 Cal.App.3d at p. 620, 216 Cal.Rptr. 502.)   In “approving timber harvesting plans, the board must conform not only to the detailed and exhaustive provisions of the [FPA], but also to those provisions of CEQA from which it has not been specifically exempted by the Legislature.”  (Sierra Club, supra, 7 Cal.4th 1215, 1228, 32 Cal.Rptr.2d 19, 876 P.2d 505.)   The THP, therefore, is only exempt from chapters 3 and 4 of CEQA, which deal with the various requirements of an EIR. (Id. at p. 1230, 32 Cal.Rptr.2d 19, 876 P.2d 505.)

In 1991, the board enacted rule 912.9.   This rule requires THPs to contain a cumulative impact assessment of the following resource subjects:  watershed, soil productivity, biological, recreation, visual, and traffic.  (Rule 912.9.)   Rule 912.9 “sets out criteria imposed for cumulative impact assessment paralleling the criteria developed for EIR's in CEQA cases.”  (East Bay Mun. Utility Dist. v. Department of Forestry & Fire Protection (1996) 43 Cal.App.4th 1113, 1127, 51 Cal.Rptr.2d 299.)   Under the new regulations, THPs must include information about the pending project and also past, present, and reasonably foreseeable future projects.  (Rule 912.9.)   The registered professional forester who prepares the THP on behalf of the logging company is directed to consider both on- and off-site interactions of the plan “with the impacts of past and reasonably foreseeable future projects.”  (Rule 912.9, Tech. Rule Addendum No. 2.) The regulations also require CDF to supplement as needed the cumulative impacts information supplied to ensure “all relevant information is considered.”  (Rule 898.)

 The statutory framework of the FPA, Forest Practice Rules, and CEQA therefore confer on CDF “the obligation to see that cumulative impacts and alternatives to the project, as well as other specified environmental information, be taken into consideration in evaluating [THPs].” (Friends of the Old Trees v. Department of Forestry & Fire Protection (1997) 52 Cal.App.4th 1383, 1393, 61 Cal.Rptr.2d 297 (Friends of the Old Trees ).)  “CEQA specifically provides that a document written in lieu of an EIR, such as a THP, and submitted to a certified regulatory agency, such as the Department, include ‘a description of the proposed activity with alternatives to the activity.’ (§ 21080.5, subd. (d)(3)(A).)   In Sierra Club, the Supreme Court stated that the THP must ‘include a description of the proposed activity, its alternatives, and mitigation measures to minimize any significant adverse environmental impact․’  (Sierra Club, supra, 7 Cal.4th at p. 1230, 32 Cal.Rptr.2d 19, 876 P.2d 505, italics added.)   Moreover, the forestry rules governing the preparation of [THPs] require that the cumulative impact of the proposed timber harvesting be considered as a substantive criterion for evaluating the environmental impact of the proposed project.  [Citation.]”  (Friends of the Old Trees, supra, 52 Cal.App.4th at pp. 1393-1394, 61 Cal.Rptr.2d 297.)

Once a THP has been approved, amendments may be made (§ 4591).   Section 4591 provides:  “Amendments to the original timber harvesting plan may be submitted detailing proposed changes from the original plan.   Substantial deviations from the original plan shall not be undertaken until the amendment has been filed with, and acted upon, by the department in accordance with Sections 4582.7 and 4583․”

 CDF may require amendments to make THPs comply with subsequently enacted regulations.  “[A]ll timber operations shall conform to any changes or modifications of standards and rules made thereafter unless prior to the adoption of such changes or modifications, substantial liabilities for timber operations have been incurred in good faith and in reliance upon the standards in effect at the time the plan became effective and the adherence to such new rules or modifications would cause unreasonable additional expense to the owner or operator.” (§ 4583.)

In section 4591.1, the Legislature has directed the board to “specify by regulation those deviations which may be undertaken by an operator without submission of an amended plan but which must subsequently be reported to the department, and provide for the manner of so reporting.”  “Minor deviations may be undertaken by the person who submitted the plan without submission of an amendment to the plan and shall be reported immediately in writing to the Director.”  (Rule 1040.)  “ ‘Minor deviations' means any change, minor in scope, in a plan which can reasonably be presumed not to make a significant change in the conduct of timber operations and which can reasonably be expected not to significantly adversely affect timberland productivity or values relating to soil, water quality, watershed, wildlife, fisheries, range and forage, recreation, and aesthetic enjoyment.”  (Rule 895.1.)   All other changes are presumed to be “substantial,” and subject to public review (§§ 4591, 4582.7, 4583).

III. CDF Abused Its Discretion in Accepting a Cumulative Impacts Evaluation as a Minor Modification

Although the statutory and regulatory framework clearly requires THPs after 1991 to contain an extensive evaluation of cumulative impacts, the statutes and regulations do not specifically address the question posed here:  When a THP provides essentially no information on cumulative impacts, does CDF abuse its authority by approving an amendment addressing this issue as a minor deviation, exempt from public review?   Schoen argues no, and cites the importance of public review and cumulative impacts in CEQA. CDF and Louisiana-Pacific contend CDF has discretion to make this determination and rely on provisions in the FPA and the Forest Practice Rules.

Schoen contends CDF exercised its discretion on April 21, 1992, and required Louisiana-Pacific to amend both THPs to comply with rule 912.9;  it was thereafter, Schoen maintains, barred from modifying its position to lessen the requirements.   Schoen offers no authority to support this contention and we reject imposing such an inflexible and unreasonable rule onto CDF. CDF is not wedded to its prior decision;  especially when the original decision was based on a Court of Appeal decision later reversed in part by the Supreme Court (see PuRePac, supra, 7 Cal.4th 111, 27 Cal.Rptr.2d 11, 865 P.2d 728).   Thus, we find, CDF did not abuse its discretion simply because it modified its position.

 The second aspect of Schoen's argument, however, is more persuasive.   Schoen contends CDF abused its discretion by approving the analysis of cumulative impacts as minor deviations, because this action denied the public any review of the documents.   In this case, THP 100 and THP 145 were essentially silent on the issue of cumulative impacts.   The THPs approved in 1989 contained the identical discussion under the heading “Future,” which was as follows:  “One additional THP is presently being considered in the immediate area.   A tentative map of this future THP is included for your review.   Modern environmentally sensitive harvesting methods using cable logging techniques, where appropriate, will allow for timber to be harvested in this area without causing a significant environmental impact when considered either separately or in conjunction with other events in the area.   Cable yarding on the steeper slopes will minimize the potential for sediment to enter the stream system.   Other potential adverse cumulative effects associated with the proposed THP have been considered and no problems have been identified.

“I am aware of no other projects which are being planned at this time in this area.   Land adjacent to the plan area is predominately zoned TPZ [timber production zone].   It is probable that future activities will be consistent with this land use classification and that future harvesting in this area will conform to the forest practice act and other regulations which may exist at the time of future harvest.   Review and observation of the Albion river shows that no significant cumulative adverse impact can be expected as a result of these harvesting operations or from the combined effect of these operations and other land use activities.”

In addition, the plans included short answers to a 15-item checklist.   Louisiana-Pacific responded that it did not expect any significant adverse cumulative impacts for each item on the checklist, except the one related to fire hazards.

The cumulative impacts evaluations in the original THPs do not provide any information on the various resource subjects specified in rule 912.9;  nor do they contain data on past, present and reasonably foreseeable future projects (rule 912.9).   Thus, the THPs do not address the manner in which these projects may compound or alter the impacts of other projects.

CDF acknowledged in its letter of September 30, 1994, the original plans did not adequately address the following areas:  watercourse and lake protection, spotted owl consultation procedures, silvicultural methods, site preparation, domestic water supply protection, hazard reduction, wildlife protection, marbled murrelet protection, late successional forest stands, logging roads and landings, archeology resource protection, and cumulative effects.

Additionally, CDF approved THP 100 and THP 145 with the following recognition:  “It is probable that future activities will be consistent with this land use classification and that future harvesting in this area will conform to the forest practice act and other regulations which may exist at the time of future harvest.”   Although Louisiana-Pacific acknowledged future operations would have to comply with subsequent regulations, it obviously could not and did not submit the documents and research supporting this assertion.

Louisiana-Pacific contends the public did review THP 1-91-080 MEN (THP 080), which was submitted by Louisiana-Pacific in 1991.   THP 080 contained a comprehensive rule 912.9 analysis and was based on the complete logging of THP 100 and THP 145.   Louisiana-Pacific asserts:  “Members of the public had the opportunity for review and comment on each THP approved before and after THPs 100 and 145, and thus had access to all information available to CDF. Under these circumstances, CDF was justified in concluding that new and additional cumulative impact analyses did not need to be performed for THPs 100 and 145, and that no additional public comment was required.”  (Italics added.)

 The public may have had an opportunity to review the rule 912.9 analysis for THP 080, but it never had an opportunity to review any of the documents supporting the specific analyses for THP 100 and THP 145.   The record before us does not contain THP 080, and we will not presume its rule 912.9 analysis would be identical to that of THP 100 and THP 145.   Furthermore, no statute or rule provides an agency with the discretion to use the cumulative impacts analysis in one plan as a substitute for the required analysis in another project.  (Schoen requests judicial notice of two letters which purportedly show other undisclosed THPs were operating in the watershed, but since these letters are not in the administrative record and are irrelevant to our determination (since we are not completing a substantial evidence analysis), we refuse this request.)

CDF and Louisiana-Pacific contend PuRePac supports a finding of no abuse of discretion, because it stated the forester could choose to comply with a subsequently enacted regulation by notifying CDF of the minor deviation.   (PuRePac, supra, 7 Cal.4th 111, 123, 27 Cal.Rptr.2d 11, 865 P.2d 728.)   However, the Supreme Court in PuRePac did not determine whether a cumulative impact analysis could be considered a minor deviation;  nor did it consider CDF's role in accepting the submitted information as a minor deviation.   Instead, the Supreme Court found the timber operations were required to comply with the regulations on the northern spotted owl, and concluded:  “Louisiana-Pacific, therefore, may select the alternative in rule 919.9 that it finds best meets the ‘on-the-ground circumstances' and then, depending on the alternative that it has selected, resubmit its plan for approval, present the information required by rule 919.9 in an amendment to the original timber harvesting plan, or, if the timber harvester concludes that the alternative in rule 919.9 that it has selected effects only a ‘minor deviation’ from the original plan, notify the director of the department of the deviation immediately in writing․  As Louisiana-Pacific has yet to indicate the means by which it will comply with rule 919.9, we express no opinion as to whether it must secure the department's approval before commencing operations.”  (PuRePac, supra, 7 Cal.4th at p. 123, 27 Cal.Rptr.2d 11, 865 P.2d 728.)

 In addition, PuRePac was concerned with a change in “operations” which impacted the “take” of an individual northern spotted owl (rule 919.9), which is a very specific evaluation, related to the operation of the timber harvest.   In contrast, an evaluation of the cumulative impacts on the watershed resources, soil productivity, biological resources, recreational resources, and visual resources (rule 912.9) is broad and encompassing.   It does not relate to the operations of timber harvest, but the information and analysis which need to occur prior to any timber operations.   Such an analysis, even if it reveals the project will have no cumulative impacts, could be classified as a minor deviation only if it updated or supplemented an existent evaluation.  (When the original THP (or substantial amendment) contains a comprehensive analysis of cumulative impacts, section 4591.1 unquestionably provides CDF with the discretion to determine whether the supplemental data are minor or significant deviations.)

It is true, as CDF argues, section 4591.1 provides the board with discretion to “specify by regulation those deviations which may be undertaken by an operator without submission of an amended plan” and rule 1040 permits the forester to make minor deviations “without submission of an amendment to the plan.”   Minor deviations, however, mean any change to a plan “which can reasonably be presumed not to make a significant change in the conduct of timber operations and which can reasonably be expected not to significantly adversely affect timberland productivity or values relating to soil, water quality, watershed, wildlife, fisheries, range and forage, recreation, and aesthetic enjoyment.”  (Rule 895.1.)   CDF cannot properly conclude the modification is minor unless it first received a complete cumulative impact evaluation.   Once CDF used its discretion to require Louisiana-Pacific to provide a cumulative impacts analysis to comply with the new regulations, it could not properly determine any modifications to the operations and plan were minor without exposing the evaluation to public review.

The importance of a cumulative impacts evaluation is stressed in CEQA. (§ 21083, subd. (b);  rules 15350, 15355;  see, e.g., Californians for Native Salmon & Steelhead Assn. v. Department of Forestry (1990) 221 Cal.App.3d 1419, 1423, 271 Cal.Rptr. 270.)   Moreover, section 21080.5, subdivision (d)(3)(A), requires a plan submitted in lieu of an EIR to include alternatives to the proposed activity and “mitigation measures to minimize any significant adverse environmental impact.”

CDF contends section 21080.5 is irrelevant, because the timber harvest review program has been certified for years as an exempt program.   However, CDF must apply the provisions of the FPA as well as “those provisions of CEQA from which it has not been specifically exempted by the Legislature.”  (Sierra Club, supra, 7 Cal.4th 1215, 1228, 32 Cal.Rptr.2d 19, 876 P.2d 505.)  “Under the maxim of statutory construction, expressio unius est exclusio alterius, if exemptions are specified in a statute, we may not imply additional exemptions unless there is a clear legislative intent to the contrary.  [Citation.]”  (Id. at p. 1230, 32 Cal.Rptr.2d 19, 876 P.2d 505.)  “The Legislature has not included timber harvesting operations within any of the classes of projects that are exempt from CEQA under sections 21080 and 21084.   We therefore reject ․ assertions that timber harvesting is ‘exempt’ from CEQA. Section 21080.5 compels instead the conclusion that timber harvesting in this state is exempt only from chapters 3 and 4 of CEQA and from section 21167 of that act.”  (Id. at p. 1231, 32 Cal.Rptr.2d 19, 876 P.2d 505, fn. omitted.)

CDF also argues section 21080.5 applies to the original THP, but does not apply to an amendment.   CDF claims:  “Moreover, the specific ‘review and comment’ requirement of section 21080.5(d)(3)(ii), specifically relied upon by appellants, is already set forth in section 4582.6 and section 4582.7 of the Act, and those provisions, which are applicable to the initial review of timber harvest plans, fully satisfy the program exemption requirements of section 21080.5(d)(3)(ii).   Appellants' efforts to take what is clearly a requirement for initial plan reviews under an EIR exempt program and apply it instead to the post-approval amendment of an individual THP is simply meritless.”   The reasons underlying the requirements for the initial plan, however, do apply to an amendment when the initial plan fails to contain any of the newly required information.   Furthermore, section 21080.5 emphasizes the importance of a cumulative impacts evaluation to the environmental review process.

 Louisiana-Pacific contends the limited nature of the remaining timber operations on THP 100 and THP 145 supported CDF's decision to define the modifications as minor.   Only 13 of the original 240 acres on THP 100, and 89 of the original 241 acres on THP 145, remain available for operations.   Such information is relevant to a substantial evidence review, but is irrelevant to a review of CDF's authority to permit a forester to bypass the public review process.

 Public review is essential to CEQA. The purpose of requiring public review is “ ‘ “to demonstrate to an apprehensive citizenry that the agency has, in fact, analyzed and considered the ecological implications of its action.” ’  [Citation.]”  (Sierra Club, supra, 7 Cal.4th 1215, 1229, 32 Cal.Rptr.2d 19, 876 P.2d 505.)   Public review permits accountability and “ ‘informed self-government.’ ”  (Ibid.) The court in Friends of the Old Trees, supra, 52 Cal.App.4th 1383, 1402, 61 Cal.Rptr.2d 297 stressed the critical need to recirculate to the public all information relating to a cumulative effects analysis prior to adding the documents to the agency file.   “[P]ublic review and comment [ ] ensures that appropriate alternatives and mitigation measures are considered, and permits input from agencies with expertise in timber resources and conservation.”  (Hewlett v. Squaw Valley Ski Corp. (1997) 54 Cal.App.4th 499, 525, 63 Cal.Rptr.2d 118.)   Thus public review provides the dual purpose of bolstering the public's confidence in the agency's decision and providing the agency with information from a variety of experts and sources.

 The necessity for public review does not diminish simply because the forester and CDF determine the change in operation will not have any environmental impact.   Under CEQA, even when the agency determines a project will have no significant environmental impact, the agency must prepare a negative declaration.   The documents supporting this decision are still subject to public review.  (Rule 15071, subd. (c).)

 Here, Louisiana-Pacific conducted its own cumulative impact analysis, without the benefit of any public review, and then determined only a minor change in operations was necessary.   Louisiana-Pacific's analysis may be completely accurate, but under CEQA, CDF must receive data on this critical subject from other experts and sources before making its final assessment.

CDF did conclude Louisiana-Pacific's change in operations, which was to remove winter period operations, reduced the potential for adverse environmental impacts.   However, CDF stated at oral argument that it was comparing the modification to the original THP. A modification in response to a more stringent regulation would necessarily lessen, or at least not increase, the adverse environmental effects of the original plan.   Thus, if the comparison is to the original plan, all modifications in response to subsequent, more stringent regulations, would be “minor” deviations.

Finally, CDF and Louisiana-Pacific assert this situation is analogous to a supplemental EIR. Rule 15162 et seq. authorizes a public agency to allow an addendum to an already approved EIR, provided the circumstances triggering the preparation of a more formal subsequent EIR are not present.  (See § 21166;  see also Fund for Environmental Defense v. County of Orange (1988) 204 Cal.App.3d 1538, 1544, 252 Cal.Rptr. 79.)   Generally, after the project has been approved, “the interests of finality are favored over the policy of encouraging public comment.”  (Laurel Heights Improvement Assn. v. Regents of University of California (1993) 6 Cal.4th 1112, 1130, 26 Cal.Rptr.2d 231, 864 P.2d 502.)   Louisiana-Pacific notes preparation and recirculation of a supplemental EIR for an approved project is the exception (Fund for Environmental Defense v. County of Orange, supra, 204 Cal.App.3d at pp. 1550-1552, 252 Cal.Rptr. 79).

A supplemental EIR, however, differs significantly from the situation here.   With a supplemental EIR, the public has already reviewed the cumulative impact analysis in the original EIR. The concern is whether the “change” in the plan affects the prior analysis.   Here, as Schoen asserts, there “has been no argument about changes in an already approved project or changed circumstances, because the public was never given the opportunity to critique the documentation and analysis that was submitted.”   Moreover, when a supplemental EIR is approved, the record can be reviewed.   Here, there is no information on the cumulative effects, especially since THP 080 was not included in the record.   Had a cumulative impact analysis been included in the original THPs, analogizing this statute to a supplemental EIR would have been more appropriate.

 In accepting the cumulative impact analysis as a minor modification when the approved THPs provided essentially no cumulative impact evaluation, the board failed to proceed in the manner prescribed by CEQA and the FPA. CDF has the discretion to determine whether a change in operations is so minor the plan does not need to be amended, but it abuses its discretion when it determines information as critical as cumulative impacts can be added to the plan without any public review.   Prejudice is presumed because the public was denied its right to review as required by CEQA, and CDF relied exclusively on information provided by the forester.   CDF therefore did not consider any information from other public agencies and their experts, which may have resulted in a different analysis or conclusion (see § 4582.6).

 In holding CDF did not comply with CEQA and the FPA we are not suggesting CDF's actions were necessarily pernicious.   Instead, we are concerned about CDF's permitting a forester to “update” cumulative impacts information as a minor modification, partially because it has determined the critical information has already been provided in a THP for a separate and distinct project.   Such a practice would make it impossible to have any meaningful public review of the cumulative impacts of the project being modified.   Furthermore, it prevents any public input on whether the projects have identical cumulative impacts analyses.  “ ‘ “The people, in delegating authority, do not give their public servants the right to decide what is good for the people to know and what is not good for them to know.   The people insist on remaining informed so that they may retain control over the instruments they have created.” ’ ”  (Kunec v. Brea Redevelopment Agency (1997) 55 Cal.App.4th 511, 515, 64 Cal.Rptr.2d 143, citing Register Div. of Freedom Newspapers, Inc. v. County of Orange (1984) 158 Cal.App.3d 893, 907, 205 Cal.Rptr. 92.)

 This holding will not undermine the policy of presuming an approved THP is valid (see Laurel Heights Improvement Assn. v. Regents of University of California, supra, 6 Cal.4th 1112, 1132, 26 Cal.Rptr.2d 231, 864 P.2d 502).   THPs are conclusively presumed to comply with the requirements at the time of their approval;  but section 4583 makes it clear THPs are not presumed to be in conformance with subsequently enacted rules and standards.   When the original plan contains essentially no information on this critical subject, and CDF has exercised its discretion in requiring the information, it cannot avoid public review and defeat the objective of CEQA by classifying the amendment to the plan as minor.

CONCLUSION

We find CDF abused its discretion when it classified the modifications to THP 100 and THP 145 as minor, thereby eliminating any public review.   CDF does not have the discretion to streamline procedures in a manner which denies the public any review of the cumulative impacts evaluation.   Information on this critical subject can only be deemed a minor modification to the plan when it updates or supplements a prior cumulative impact analysis for the same project.   Accordingly, we reverse the judgment and Schoen is awarded costs.

FOOTNOTES

FOOTNOTE.  FN* Reporter's Note:  Opinion deleted upon direction of Supreme Court by order dated October 21, 1993 (A057971).

LAMBDEN, Associate Justice.

KLINE, P.J., and RUVOLO, J., concur.

Was this helpful?

Thank you. Your response has been sent.

Welcome to FindLaw's Cases & Codes

A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes visit FindLaw's Learn About the Law.

Go to Learn About the Law
SCHOEN v. LOUISIANA PACIFIC CORPORATION (1997)

Docket No: No. A074723.

Decided: August 07, 1997

Court: Court of Appeal, First District, Division 2, California.

Get a profile on the #1 online legal directory

Harness the power of our directory with your own profile. Select the button below to sign up.

Sign up

Learn About the Law

Get help with your legal needs

FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.

Learn more about the law
Copied to clipboard