GOLDBERG et al. v. UNDERHILL.
The plaintiffs-respondents, a physician and dentist respectively, contracted with the defendant-appellant H.W. Underhill, a licensed architect and contractor, for the construction of an office building. The complaint herein contained three causes of action, and claimed damages resulting from (1) defective plans negligently prepared by defendant; (2) defective construction supervised by the defendant; (3) fraud and misrepresentation in respect to the cost of the proposed building, etc. The trial court found in favor of plaintiff as follows: $1,000.00 damages in respect to the first cause of action; $3,000.00 damages on the second cause of action; $1,000.00 damages on the third cause of action. The defendant has appealed from this judgment.
The appellant's brief avers that “the plaintiffs did not sustain their burden of proof in any of these respects”, and that “Practically all of the plaintiffs' evidence was directly controverted by one or more witnesses on behalf of the defendant”. Appellant maintains that “Where an architect draws plans under a written contract, he is not liable for damages allegedly caused by either (a) a decision by the owners arrived at during construction, that they do not like the location of a lavatory or toilet, or (b) a change from the plans necessitated because a certain kind and size of air conditioning unit could not be obtained”. It is likewise claimed that a contractor is not liable for damages caused by deviations from the plans ordered by the owners; that an unambiguous written contract cannot be altered “by verbal conversations or alleged verbal agreements occurring prior to its execution”. On the issue of fraud, it is claimed that the trial court erred in not permitting the defendant to prove that plaintiffs had actually received in value much more than the amount paid out, and therefore suffered no loss.
The argument that the trial court “seemingly gave more credence to the testimony of the medical profession than to the testimony of these men of the construction trade itself”, and that there were “13 expert men who directly and unequivocably refuted the claims of the plaintiffs as to poor workmanship or poor materials”, goes, of course, to the weight and credibility of the evidence. It is fundamental that, where the record discloses substantial evidence in support of the findings, an appellate court will not weigh the evidence or consider whether the trial judge should not, perhaps, have arrived at a different conclusion. That the evidence herein was in conflict as to various points goes without saying; nor can it be denied that the record affords substantial evidence in support of the trial court's findings.
There is evidence, as found by the trial court, to the effect that the defendant architect-contractor, represented that the building would cost less than $12,000.00 whereas its cost was in excess of $22,000.00; that the building was not completed within the time as represented; that neither the plans prepared nor the construction thereunder was such as the plaintiffs had a right to expect; that the building was erected in an “unskillful” and “unworkmanlike manner”. The many shortcomings include inadequate space for receptionist; inadequate heating and air conditioning system; location of toilet; unsuitable and inadequate doorlocks, electric wiring, soundproofing, plumbing, lighting, etc.
The appellant's argument that there should be no liability because the plans were changed by the owners during construction does not squarely meet the issues here presented, and is without merit in view of the evidence disclosed by the record. In this connection it cannot be forgotten that the defendant here occupied the dual position of architect and contractor.
The same may be said in respect to the appellant's other points, none of which present reversible error. This is particularly true in reference to the trial court's alleged error in permitting the introduction of parol evidence. That such evidence is admissible for the purpose of proving fraud is well established.
In respect to damages, there is likewise evidence which will sustain the trial court's award. Appellant's argument that since there was a difference of $10,000.00 between the represented cost of the building and the actual cost, a judgment for less than that amount cannot be sustained, “comes”, as respondents' brief suggests, “with poor grace, because the defendant is the one to benefit, and not plaintiffs”.
The judgment is affirmed.
DORAN, Justice.
WHITE, P.J., and DRAPEAU, J., concur.
Thank you for your feedback!
As the largest network of trusted legal brands, we help firms build authority across the platforms consumers and AI systems rely on most. Our network helps attorneys strengthen visibility, credibility, and preference where legal decisions begin.
Docket No: Civ. 17205.
Decided: January 25, 1950
Court: District Court of Appeal, Second District, Division 1, California.
Search our directory by legal issue
Enter information in one or both fields (Required)
Harness the power of our directory with your own profile. Select the button below to sign up.
Learn more about FindLaw’s newsletters, including our terms of use and privacy policy.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)